Docket No. 22-45-EL The Narragansett Electric Co. d/b/a Rhode Island Energy's Long-Term Contracting for Renewable Energy Recovery Factor Docket is closed. Filings relating to the LTC Recovery Factor for period July 2023 - December 2023: Rhode Island Energy's proposed Long-Term Contracting for Renewable Energy Recovery Factor (“LTC Recovery Factor”) for the period June 2023 through December 2023 (5/15/23) Division of Public Utilities Memorandum (6/9/23) PUC Order 24700 approving RI Energy's Long-Term Contracting for Renewable Energy Recovery (LTC) Factor for the period July 2023 through December 2023. Filings relating to the LTC Recovery Factor for period January 2023 - June 2023: Rhode Island Energy's proposed Long-Term Contracting for Renewable Energy Recovery Factor (“LTC Recovery Factor”) for the period January 2023 through June 2023 (11/15/22) Division's Position Memorandum (12/5/22) Rhode Island Energy's Compliance Tariff Filing - Long-Term Contracting for Renewable Energy Recovery Factor of $0.267 per kWh, approved by the PUC at the December 20, 2022 Open Meeting PUC Order 24615 approving RI Energy's Long-Term Contracting for Renewable Energy Recovery (LTC) Factor for the period January 2023 through July 2023. Link to RI Energy's 2022 LTC Contracting Factor - Docket No. 5201