National Grid - Docket No. 4764 - Order 23102 approving National Grid's November 1, 2017 Request for Approval of Eight Long-Term Renewable Energy Contracts. Order issued 4/9/18.

National Grid - Docket No. 4536-C - Order 23095 approving National Grid’s request to amend the certification for the RE Growth Small Scale Solar Aggregation by increasing the 12 MW maximum capacity to 140 MW. Order issued 4/5/18.

National Grid - Docket No. 4692 - Order 23098 approving National Grid's proposed Standard Offer Service Rates for the Residential, Commercial and Industrial Groups for effect April 1, 2018. Order issued 4/5/18.

Pascoag Utility District - Docket No. 4761 - Order 23096 approving Pascoag Utility District's 2018 Demand Side Management and associated budget. Order issued 4/5/18.

Pascoag Utility District - Docket No. 4762 - Order 23097 approving Pascoag Utility District's Annual Reconciliation Tariff Filling and associated rates effective January 1, 2018.. Order issued 4/5/18.

Block Island Power Co. - Docket No. 4690 - Order 23099 granting Block Island Power Co.'s request to continue its Standard Offer Service Procurement Plan through April 2020. Order issued 4/5/18.

Block Island Power Co. - Docket 4606 - PUC Order 23066 granting BIPCo a continued exemption from the requirement of the URA R.I. Gen. Laws Section 39-1-27(c) until April 20, 2020. Order issued 3/26/18.

Block Island Power Co. - Docket No. 4606 - PUC Order 23065 granting BIPCo a continued exemption from the requirement of teh URA R.i. Gen. Laws Section 39-1-127(c) until August 1, 2018. Order issued 3/26/18.

Clear River Energy LLC and National Grid - Docket No. 4737 - PUC Advisory Opinion to the Energy Facility Siting Board Regarding the Narragansett Electric Company d/b/a National Grid and Clear River Energy LLC's Application to Construct the Burillville Interconnection Project. Opinion issued 3/9/18.

Block Island Power Co. - Docket 4606 - Order 23019 approving BIPCo's February 3, 2017 request for a waiver from the requirement of the Act under R.I. Gen. Laws § 39-1-27(g). Order issued 2/1/18.

Tesla, Inc. & Sunrun, Inc. (Petitioners) - Docket No. 4743 - Order 22991 issued to Tesla, Inc. & Sunrun, Inc. on its Petition for Declaratory Judgment. Order issued December 22, 2017.

National Grid - Docket No. 4605 - Order 22992 approving National Grid's SOS Rates for Industrial Group for the period January 2018 - March 2018. Order issued 12/22/17.

National Grid - Docket No. 4605 - Order 22956 approving National Grid's SOS Rates for Residential Group & Commercial Group for the period October 2017-March 2018 and Industrial Group for the period October 2017-December 2017. Order issued 11/17/17.

Wind Energy Development LLC (WED) and ACP Land, LLC (Petitioners) - Docket No. 4483 - Order No. 22957 issued to the Petitioners and The Narragansett Electric Co. d/b/a National Grid in response to the Peittion for Dispute Resolution to Interconnetion. The Order encompasses the issues outlined in Part II of this page. Written Order issued November 27, 2017.

National Grid - Docket No. 4592 - Order No. 22929 approving National Grid's Electric 2017 ISR Reconciliation Filing and associated factors for effect October 1, 2017 - September 30, 2018. Written Order issued 10/24/17.

National Grid - Docket Nos. 4580 & 4581 - Order No. 22926 approving National Grid's 2016 Energy Efficiency Program Plan effective January 1, 2016; and approving National Grid's 2016 System Reliability Procurement Report effective January 1, 2016. Written Order issued 10/16/17.

National Grid - Docket No. 4707 - Order No. 22927 approving National Grid's Renewable Energy Growth Program Factors and Renewable Energy Growth Program Reconciliation Factors effective October 1, 2017. Order issued 10/16/17.

ISM Solar Development, Pascoag Utility District and National Gridj - Docket No. 4636 - Order 22876 approving National Grid's Motion to Remove Certain Requirements in its Renewable Energy Growth Tariff and that National Grid be entitled to full cost recovery for ISM Solar Development participation in the National Grid Renewable Energy Growth Programs. Written Order issued 9/22/17. PUC Errata Order No. 22902.



National Grid - Docket No. 4605 - Order 22807 approving National Grid’s proposed Standard Offer Service rates for the Industrial Group for the period July – September 2017. Written Order issued 6/2/17.

National Grid - Docket Nos. 4536 & 4589 - Order 22791 approving Certificates of Eligibility for commercial scale & large scale projects that have been chosen by National Grid for participation in the Renewable Energy Growth Program Years 2015 & 2016. Written Order issued 5/12/17.

National Grid - Docket No. 4692 - Order 22774 approving National Grid's proposed 2018 SOS Procurement Plan and 2018 RES Procurement Plan. Written Order issued 5/12/17

National Grid - Docket No. 4610 - Order No. 22790 issued to National Grid approving its requests to amend the tariff to add three new sites to the Environmental Response Site. Written Order issued 5/9/17.

National Grid - Docket No. 4393 - Order No. 22771 approving National Grid's Standard Offer Service Rates Filings (submitted on November 21, 2013, February 24, 2014, May 27, 2014 and August 22, 2014) for the Residential, Commercial and Industrial Groups. The filings were submitted pursuant to the 2014 Standard Offer Service Procurement Plan. Written Order issued 4/18/17.

Office of Energy Resources - Docket No. 4604 - Order No. 22765 approving the Office of Energy Resources’ budgetary request for the 2018 Renewable Energy Growth Program. Written Order issued 4/13/17.



Rules Governing the Termination of Residential Electric, Gas and Water Utility Service - Docket No. 1725 - Order No. 22764 extending the moratorium on utility shutoffs until May 1, 2017. Written Order issued 4/13/17.

Pascoag Utility District - Docket No. 4664 - Order No. 22762 approving Pascoag Utility District's proposed Standard Offer Service rate, transition charge and transmission charge as revised, effective January 1, 2017. Written Order issued 4/11/17.

Pascoag Utility District - Docket No. 4663 - Order No. 22759 approving Pascoag Utilitiy's 2017 Demand Side Management Filing. Written Order issued 3/28.17.

National Grid - Dockets 4556 & 4605 - Order No. 22744 approving National Grid’s February 27, 2017 Motion to Amend its 2016 and 2017 Renewable Energy Standard Procurement Plans. Written Order issued 3/23/17.

National Grid - Dockets 4251 & 4252 - Order 22712 approving the Soft-Off Agreement between National Grid and the Division of Public of Public Utilities and Carriers. Written Order issued 3/9/17.

National Grid - Docket No. 4605 - Order 22611 approving National Grid’s proposed Standard Offer Service rates for the Residential, Commercial and Industrial Group for effect April 1, 2017. Written Order issued 3/9/17.

National Grid - Docket No. 4605 - Order 22677 approving National Grid's 2017 RES Procurement Plan, rejecting the 2017 SOS Procurement Plan, authorizing the continuation of the 2016 SOS Procurement Plan for the 2017 procurement period of January 1, 2017 - December 31, 2017. Written Order issued 2/22/17.

National Grid - Docket No. 4628 - Order No. 22672 approving National Grid's July 5, 2016 Tariff Advice Filing to add LED Streetlights to the Company-Owned Streetlighting Tariff. Written Order issued 2/20/17.

National Grid - Docket No. 4673 - Order No. 22671 approving National Grid's revised Long-Term Contract Recovery Factor of 0.667¢ per kWh effective 1/1/17. Written order issued 2/20/17.

Human Services and National Gird - Docket No .4290 - Order No. 22670 approving a LIHEAP Enhancement Charge of $0.81 per month for gas and electric service for the calendar year 2017; and approving National Grid's LIHEAP Enhancement Plan Provision Tariff RIPUC No. 2170. Written Order issued 2/6/17.

National Grid - Docket No. 4599 - Order No. 22650 approving National Grid's proposed 2016 Electric Retail Rate filed on February 15, 2016 and further revised on March 21, 2016. The rates are approved effectived April 1, 2016. Written Order issued January 11, 2017.

National Grid - Docket No. 4556 - Order No. 22650 approving National Grid's proposed 2016 RES Reconciliation Filing and RES Charge of $0.00288/kWh effective April 1, 2016. Written Order issued 1/11/17.

National Grid - Docket No. 4610 - Order 22638 approving National Grid's Environmental Response Fund Provision proporal to add new site, Chandonnet Site, to the list of Environmental Response Site. Written Order issued 12/21/16.

National Grid - Docket No. 4539 - Order No. 22635 approving National Grid's August 1, 2016 Annual Report and Reconciliation Filing. Written Order issued 12/21/16.

National Grid - Docket No. 4556 - Order 22612 approving the Company’s June 12, 2016 proposed SOS rates for the Residential Group and Commercial Group for the period October 2016 through March 2017 and for the Industrial Group for the period October 2016 through December 2016. Written Order issued 11/29/16.

National Grid - Docket No. 4631 - Order No. 22609 approving National Grid's Tariff Advice to Amend Net Metering Provision effective August 12, 2016. Written Order issued 11/21/16.

National Grid - Docket No. 4626 - Order 22608 approving National Grid's RE Growth Program Factors and RE Growth Reconciliation effective October 1, 2016. Written Order issued 11/2/16

National Grid - Docket No. 4640 - Order No. 22605 approving National Grid's August 15, 2016 amendments to its Renewable Energy Growth Program tariffs. Written Order issued 11/11/16.

National Grid - Docket No. 4637 - Order No. 22570 approving National Grid's proposed 2016 Pension Adjustment Factor of $0.00091/kWh for effect on October 1, 2016. Written Order issued 10/13/16.

National Grid - Docket No. 4265 - Order No. 22571 approving the Fourth Amendment to Power Purchase Agreement dated May 27, 2016 between National Grid and Orbit Energy Rhode Island. Written Order issued 10/13/16.



National Grid - Docket No. 4237 - Order No. 22567 issued to National Grid finding the company’s Contact Voltage Annual Report for FY 2016 in compliance with PUC's orders. Written Order issued 10/7/16.



Block Island Power Co. - Docket No. 4606 - Order No. 22565 approving BIPCo's Request for Waiver Pursuant to R.I. Gen. Laws § 39-1-27(g) filed on March 7, 2016. Written Order issued 10/7/16.

Block Island Power Co. - Docket No. 4635 - Order No. 22564 approving BIPCo's Petition for Emergency Relief filed on June 29, 2016 and BIPCo's request for approval to continue recovering engine rental costs filed on September 20, 2016. Written Order issued 10/7/16.

National Grid - Docket No. 4542 - Order No. 22502 approving National Grid's Renewable Energy Growth Factors for effect July 1, 2015 through March 31, 2016. Written Order issued 8/5/16.

National Grid - Docket No. 4491 - Order No. 22474 approving National Grid's August 22, 2014 Revised Request for Proposals for Long-Term Contracts for Renewable Energy Projects. Written Order issued 7/12/16.

National Grid - Docket No. 4617 - Order No. 22475 approving National Grid's proposed 2016 Revenue Decoupling Mechanism Reconciliation Adjustment Factor of $0.00085/kWh for effect on July 1, 2016. Written Order issued 7/12/16.

National Grid - Docket No. 4518 - Order No. 22472 approving National Grid's 2015 Pension Adjustment Factor of $0.00012/kWh effective November 1, 2015. Written Order issued 7/12/16.

National Grid - Docket No. 4568 - Oder No. 22465 approving National Grid's Motion to Withdraw rate design proposal filed on July 31, 2015. Written Order issued 7/6/16.

National Grid - Docket No. 4592 - Order No. 22471 approving National Grid's Revised Electric Infrastructure, Safey and Reliability Plan FY 2017 filed on December 9, 2015; also associated compliance tariffs for effective 4/1/16. Written Order issued 7/11/16.

National Grid - Docket No. 4505 - Order No. 22454 approving National Grid's May 15, 2014 Electric Revenue Decoupling Mechanism Reconciliation Filing. Written Order issued 6/28/16.

National Grid - Docket No. 4566 - Order No. 22455 approving National Grid's May 14, 2015 Electric Revenue Decoupling Mechanism Reconciliation Filing. Written Order issued 6/28/16.

Pascoag Utility District - Docket No. 4585 - Order 22452 approving Pascoag Utility District's 2015 Demand Side Management and associated budget. Written Order issued 6/28/16.

Pascoag Utility District - Docket No. 4619 - Order 22443 approving Pascoag Utility's Tariff Advice to remove language pertaining to nonregulated power producers. Order issued 6/16/16.

National Grid - Docket No. 4513 - Order No. 22413 approving National Grid's March 23, 2015 street light metering pilot with modifications, and approving a cost recovery proposal for pilot. Order issued 5/20/16.

National Grid - Docket No. 4556 - Order No. 22444 issued to National Grid in connection with the Company's March 2, 2015 proposed 2016 Standard Offer Service Procurement Plan and 2016 Renewable Energy Standard Procurement Plan. Order issued 6/21/16.

National Grid - Docket No. 3628 - Order No. 22456 approving National Grid’s January 8, 2106 proposed modifications to the Customer Contact standard of its Service Quality Plan. Written Order issued 6/28/16.

National Grid - Docket No. 4556 - Order No. 22420 approving National Grid’s April 13, 2016 proposed Standard Offer Service Rates for the Industrial Group for the period July 2016 – September 2016. Order issued 5/24/16.

National Grid - Docket No. 4556 - Order No. 22435 approving National Grid's proposed Standard Offer Service rates for the Industrial Group for the period April 2016 – June 2016. Written Order issued 6/14/16.      

Pascoag Utility District - Order Order 22419 approving Pascoag Utility’s March 25, 2016 request to use storm funds for incremental expenses incurred. Order issued 5/24/16.

National Grid - Docket No. 4570 - Order 22365 finding The Narragansett Electric d/b/a National Grid's June 26, 2015 Request for Proposals for Clean Energy Projects complies with the Affordable Clean Energy Security Act, R.I. Gen. Laws §§ 39-31-1 to 9. Written Order issued 3/23/16.

National Grid - Docket No. 4473 - Order No. 22356 approving National Grid's electric ISR reconciliation and recovery of Net Operating Losses for FY 2012-2015. Written Order issued (3/14/16)

National Grid - Docket No. 4237 - Order No. 22355 finding National Grid's June 30, 2015 Contact Voltage Annual Report in compliance with PUC's orders. Written Order issued 3/14/16.

Rhode Island Airport Corporation - Docket No. 4591 - Order No. 22310 granting Airport Corp.'s Petition for Declaratory Judgment seeking a declaration that it falls within the definition of public entity set forth in R.I. Gen. Laws § 39-26.4-2(12) (Net Metering Act). Written Order issued 1/26/16.  



National Grid - Docket No. 4587 - Order No. 22461 approving National Grid’s semi-annual Long-Term Contracting Recovery Factor for the period July 1, 2016 through December 31, 2016. Written Order issued 6/30/16.

National Grid - Docket No. 4587 - Order No. 22311 approving National Grid’s semi-annual Long-Term Contracting Recovery Factor for the period January 1, 2016 through June 30, 2016. Written Order issued 1/26/16.

Pascoag Utility District - Docket No. 4584 - Order No. 22305 approving Pascoag Utility District’s annual reconciliation of its Standard Offer Service, Transmission, and Transition Rates filing as amended, effective January 1, 2016

National Grid - Docket No. 4574 - Order No. 22209 approving the Purchase Power Agreement executed between National Grid and Copenhagen Wind Farm, LLC.. Written Order issued 11/6/15.

RI Distributed Generation Board - Docket No. 4536-B - Order No. 22180 approving the Distributed Generation Board's of $125,000 to perform Solar Quality Assurance Report. Written Order issued 10/26/15.

National Grid - Docket No. 4539 - Order No. 22174 approving National Grid's FY 2016 Electric Infrastructure, Safey and Reliability Plan. Written Order issued 10/21/15.

Block Island Power Co. - Docket No. 4579 - Order 22169 approving Block Island Power Company's proposed tariff advice to add LED streetlights to the Streetlight Tariff. Written Order issued 10/21/15. sion effective on or after April 1, 2015. Written Order issued 9/4/15.

Pascoag Utility District - Docket No. 4563 - Order No. 22023 approving Pascoag Utility's LED Street Light Tariff Advice Filing. Written Order issued 8/6/15.

National Grid - Docket No.4535 - Order No. 21946 approving National Grid's May 15, 2015 proposed Long-Term Contract Recovery Factor effective July 1 - December 31, 2015. Written Order issued 6/18/15.

National Grid - Docket No. 4277 - Order No. 22027 approving Settlement Agreement between National Grid and WED Coventry One. regarding the Third 2014 Distributed Generation Enrollment Report . Written Order issued 8/6/15.

National Grid - Docket No. 4277 - Order No. 21875 issued in response to WED Coventry One's Objection to NGrid's Third 2014 DG Enrollment Report . Written Order issued April 20, 2015.  



National Grid - Docket No. 4535 - Order No. 21877 approving National Grid's November 14, 2014 proposed revised LTCRER factor effective January 1 - June 30, 2015. Written Order issued 4/20/15.

RI Turnpike and Bridge Authority - Docket No. 4557 - Order No. 21867 finding the RI Turnpike and Bridge Authority is a public entity under R.I.G.L. 39-26.4-2(12). Written Order issued 4/1/15.

Pascoag Utility District - Docket No. 4529 - Order No. 21866 approving Pascoag's proposed Standard Offer Service Charge, Transmission Charge and Transition Charge effective January 1, 2015. Written Order issued 4/1/15.

National Grid - Docket No. 4527 & Docket No. 4528 - Order No. 21854 approving National Grid's 2015 Energy Efficiency Program Plan (EPP) and EPP Factor; and approving National Grid's 2015 System Reliability Procurement (SR) Report and associated SRP factor effective January 1, 2015. Written Order issued 3/19/15)

National Grid - Docket No. 4490 - Order No. 22451 approving National Grid's proposed Standard Offer Service (SOS) Rates submitted pursuant the approved 2015 SOS Procurement Plan. Written Order issued 6/28/16.

National Grid - Docket No. 4490 - Order No. 21826 approving National Grid's 2015 Standard Offer Service Procurement Plan and 2015 Renewable Energy Supply Procurement Plan. Written Order issued 2/23/15.

National Grid - Docket No. 4493 - Order No. 21827 issued to National Grid regarding the Company's November 30, 2014 proposed standard offer service rates for the Residential, Commercial and Industrial Groups, and approving revised SOS rates for effect January 1, 2015. Written Order issued 2/23/15.

National Grid - Docket No. 4382 - Order No. 21810 approving CapEx and O&M reconciliation factors proposed by National Grid for FY 2014 ISR Reconciliation effective October 1 - September 30, 2015. Written Order issued 2/5/15.

PUC Rulemaking Report - Docket No. 4503 - Report summarizing the travel of the case and rationale for adopting amended regulations entitled "Consumer Protection Requirements for Nonregulated Power Producers. Report issued 2/4/15.

RI Energy Efficiency and Resource Management Council (EERMC)- Docket No. 4443 - Order No. 21767 approving EEMRC's proposed Energy Efficiency Savings Targets for National Grid's energy efficiency procurement for the period 2015 - 2017, and proposed amendments to the Least Cost Procurement Standards. Written Order issued 12/31/14.



National Grid - Docket No. 4522 - Order No. 21781 approving National Grid's September 2, 2014 Energy Efficiency and System Reliability Procurement Plan for three-year period 2015-2017. Written Order issued 12/19/14.

National Grid - Docket No. 4237 -Order No. 21780 finding National Grid's June 16, 2014 Contact Voltage Annual Report in compliance with PUC Orders. Written Order issued 12/16/14.

National Grid - Docket No. 4442 - Order No. 21704 approving National Grid's September 13, 2014 Customer-owned Street and Area Lighting Proposal, Tariff RIPUC No. 2142 and S-05 Tariff effective on usage on and after August 7, 2014. Written Order issued 10/31/14.

National Grid - Docket Nos. 4485 and 4393 - Order No. 21686 approving retail rates and tariffs filed by National Grid on February 14, 2014, and updated on March 26, 2014 for effect April 1, 2014. Also approving a Renewable Energy Standard (RES) Charge of $0.00480 per kWh effective April 1, 2014. Written Order issued 10/23/14.

Pascoag Utility District - Docket No. 4454 - Order No. 21612 approving Pascoag's mid-year reconciliation filing seeking an increase to the Standard Offer Service, Transition, and Transmission rates effective July 1, 2014. Written Order issued 9/9/14.



National Grid - Docket No.; 4473 - Order No. 21559 approving National Grid's Revised Electric ISR Plan filed on December 20, 2013 and associated compliance tariffs effective April 1, 2014. Written Order issued 8/12/14.

National Grid - Docket No. 4412 - Order No. 21558 approving National Grid's LTC Recovery Factor of 0.039 cent per kWh effective July 1, 2014. Written Order issued 8/12/14.

Office of Energy Resources and the Distributed Generation Standard Contract Board - Docket No. 4288 - Order No. 21685 approving OER's July 8, 2014 request for approval to fund the hiring of a consultant to perform the 2015 ceiling prices for the Renewable Energy Growth Program in the amount not exceed $65,000. Written Order issued 10/23/14.

National Grid and and the Distributed Generation Standard Contract Board - Docket Nos. 4277 & 4288 - Order No. 21507 approving National Grid's 2014 DG Enrollment Application and Process Rules and approving the DG Board' proposed Ceiling Prices, Classes and Target . Written Order issued July 2, 2014.

Pascoag Utility District - Docket No. 4452 - Order No. 21441 approving Pascoag Utility District's proposed 2014 Demand Side Management Programs, budget and DSM charge. Written Order issued 4/28/14.

Pascoag Utility District - Docket No. 4454 - Order No. 21431 approving Pascoag's proposed Standard Offer Charge, Transmission Charge and Transition Charge effective January 1, 2014. Written Order issued April 15, 2014.

National Grid - Docket No. 4237-A - Order No. 21414 finding National Grid in compliance with Order No. 20871 & No. 20950, and approving NGrid's August 29, 2013 Contact Voltage Annual Report and Recommendation. Written Order issued 3/31/14.

Office of Energy Resources and National Grid - Docket No. 4290 - Order No. 21405 approving a LIHEAP Enhancement Charge of $0.73 per month for electric and gas customers of National Grid effective 1/1/14. Written Order issued 3/26/14.

National Grid - Docket No. 3569 - Order No. 21406 approving National Grid's reduced fees for Optional Telephone or Web Pay Payment Provision. Written Order issued 3/26/14.

National Grid - Docket No. 4315 - Order No. 21362 approving 1) National Grid's modification to procurement plan filed on September 17, 2013, 2) National Grid's proposed SOS rates for Industrial Group effective October 1, 2013; and 3) National Grid's proposed SOS rates for the Industrial Group rates effective December 1, 2013. Written Order issud 2/19/14.

Review Ino the Adequacy of Renewable Energy Supplies - Docket No. 4404 - Order No. 21353 summarizing the travel of the case, and PUC's findings and decision regarding the adequacy of renewable energy supplies pursuant to R.I.G.L. § 39-26-6. Written Order issued 2/10/14.



National Grid - Docket No. 4412 - Order No. 21339 approving National Grid's LTC Recovery Factor of negative 0.021 cents per kWh effective January 1, 2014. Written Order issued 2/6/14.

National Grid - Docket No. 4307 - Order No. 21332 approving revised electric ISR factors effective October 1, 2013 - September 30, 2014. Written Order issued 2/6/14.

National Grid - Docket Nos. 4451 & 4453 - Order No. 21298 approving 1) National Grid's 2014 Energy Efficiency Program Plan, as modified, and proposed energy efficiency charge of $0.00911 per kWh in Docket 4451 effective January 1, 2104 and 2) National Grid's 2014 System Reliability Procurement Report and proposed factor of $0.00004 per kWh in Docket 4453 effective January 1, 2014. Written Order issued 12/24/13.

National Grid - Docket No. 4437 - Order No. 21234 approving National Grid's Power Purchase Agreement executed with Champlain Wind, LLC. Written Order issued November 4, 2013. A final order summarizing travel of case and PUC's decision will follow.

Rules Governing the Implementation of a Renewable Energy Resource - Docket No. 3798 - Order No.21165 approving a policy change regarding the effective date of eligibility of Renewable Energy Certificates generated by Renewable Energy Resources. Written Order issued September 26, 2013.

National Grid - Docket Nos. 4277 & 4288 - Order No. 21167 approving National Grid's August 7, 2013 revised DG Enrollment Application/Enrollment Rules and revised DG Standard Contracts. Written Order issued 9/30/13.



Town of New Shoreham - Docket No. 4425 Order No. 21166 dismissing the July 10, 2013 Town of New Shoreham's for Declaratory Judgment for lack of jurisdiction. The PUC finds that the RI Economic Development Corporation has exclusive jurisdiction over the administration of the Renewable Energy Fund. Written Order issued September 20, 2013.

National Grid - Docket No. 4397 - Order No. 21122 approving National Grid's petition for approval Energy Efficiency and Advanced Gas Technology incentive package offered to Toray Plastics, Inc. Written Order issued 8/9/13.

National Grid - Docket No. 4382 - Order No. 21121 approving National Grid's FY 2014 Electric Infrastructure,System and Reliablity Plan filed on December 31, 2012 and associated compliance tariffs effective April 1, 2013. Written Order issued 7/26/13.

National Grid - Docket No. 4232 - Order No. 21097 approving the July 21, 2011 Settlement Agreement regarding National Grid's Petition for Review of the Use of Backup Rates. The agreement is executed between National Grid, The Energy Council of RI and the Division of Public Utilities and Carriers. Written Order issued July 12, 2013. follow.

National Grid - Docket Nos. 4288 & 4277 - Order 21087 denying National Grid's April 12, 2103 Request to Amend the Current Nameplate Capacity Size Limit for Wind Projects. Written Order issued June 28, 2013

National Grid - Docket No. 4393 - Order No. 21094 approving National Grid's 2014 SOS Procurement Plan and 2014 RES Procurement Plan. Written Order issued 7/2/13.

National Grid - Docket No. 4315 - order No. 21086 approving National Grid’s May 17, 2013 proposed rate schedule for Standard Offer Service for Commercial, Industrial and Residential Groups effective July 1, 2013. Written Order issued 6i/28/13.

National Grid - Docket No. 4412 - Order No. 21085 approving National Grid’s LTCRER credit factor of (0.003) cents per kWh is hereby approved effective July 1, 2013. Written Order issued 6/28/13.

National Grid - Docket No. 4411 - Order No. 21092 approving National Grid's proposed revenue decoupling mechanism (“RDM”) adjustment factor of ($0.00044) per kWh effective July 1, 2013 through June 30, 2014. Written Order issued 7/2/13.

National Grid - Docket Nos. 4391 and 4315 - Order No. 21064 approving National Grid's proposed Annual Retail Rate Filing, as updated. Also approving National Grid's proposed Renewable Energy Standard Charge and Reconciliation Filing. Rates approved effective for usage on or after April 1, 2013. Written Order issued 6/13/13.

Pascoag Utility District - Docket No. 4369 - Order No. 21068 approving Pascoag's proposed revised Standard Offer Service Rate, Transition Charge and Transmission Charge effective January 1, 2013. Written Order issued 6/13/13.





Pascoag Utility District - Docket No. 4368 - Order No. 21053 approving Pascoag's April 3, 2103 Request to Allocate Funds to the 2013 Demand Side Management Program. Written Order issued 5/29/13.

Pascoag Utility District - Docket No. 4368 - Order No. 21052 approving Pascoag Utility District's 2013 Demand Side Management Programs. Written Order issued 5/29/13..



National Grid - Docket No. 4315 - Order No. 21023 approving National Grid's proposed SOS rates for the Industrial Group for the period April - June 2013.
Written Order issued 5/1/13.

National Grid - Docket No. 4323 - Order No. 21011 approving revised rates, charges and tariiffs effective February 1, 2013 and authorizing National Grid to collect total revenue requirement of $259,948,385 for the electric operations and $166,765,894 for the gas operations. Written Order issued April 11, 2013.



National Grid - Docket No. 4360 - Order Nos. 21003 & 21007 - Advisory Opinion issued to Energy Facility Siting Board finding that there is need to construct and alter National Grid's facilities (Interstate Reliability Project), also includes Advisory Opinion Errata Order No. 21007. Written Advisory Opinions issued April 8, 2013 and April 9, 2013.

Office of Energy Resources - Docket No. 4288 - Order No. 20995 approving OER''s 2013 Proposed Ceiling Prices revised on January 9, 2013 to reflect pricing based on the availability of the Investment Tax Credit;. Written Order issued 3/25/13.

National Grid - Docket No. 4277- Order No. 20994 approving National Grid's January 30, 2013 revised DG Enrollment Application and Enrollment Process Rules. A written Order issued 3/25/13.

Pascoag Utility District - Docket No. 4392 - Order No. 20996 approving LED Street Tariff Filing. Written Order issued March 26, 2013.





Pascoag Utility District - Docket No. 4341 - Order No. 20977 approving a Settlement Agreement authorizing Pascoag Utility to collect a total cost of service of $2,540,035 (excluding purchase power related costs) and implement revised tariffs effective February 1, 2013. Written Order issued 2/28/13.

National Grid - Docket No. 4218 - Order No. 20972 approving National Grid's 2012 FY 2012 Electric Infrastructure, Safety and Reliability Plan Reconciliation rates effective October 1, 2012. Written Order issued 2/28/13.

National Grid - Docket No. 4237 - Order No. 20950 finding National Grid in compliance with the RFP process approved in Order No. 20871 and approving National Grid's recommendation that all Designated Contact Voltage Risk Areas be surveyed and tested in the first year with a twenty percent tested each year thereafter. Written Order issued February 1, 2013.



National Grid - Docket No. 4323 - Order No. 20943 approving the November 14, 2012 Settlement Agreement, and all rates, charges and tariiffs filed by National Grid on January 24, 2013 pursuant to the Amended Settlement Agreement. The approved rates provides National Grid with a revenue requirement of $259,948,385 for the electric operations and $166,765,894 for the gas operations for effective February 1, 2013. The Order incorporates Errata Order No. 21054 to correct a clerical mistake in Order No. 20943.

Block Island Power Co. - Docket No. D-12-89 - Order No. 20931 approving Block Island Power's November 27, 2012 application to obtain a $566,400 unsecured term loan from CAT for the purpose of purchasing Engine No. 26. Written Order issued January 14, 2013.

National Grid - Docket No. 4342 - Order No. 20928 approving National Grid's December 4, 2012 proposed revisions to the Electric Tariff R.I.P.U.C No. 2072 & Gas Tariff NG-Gas No. 101 to address situation where a customer request to remove their AMR meters equipped with a radio frequency transmitter in favor of manual reads. Written Order issued 1/10/13.

RI Office of Energy Resources(OER) - Docket No. 4290 - Order No. 20920 approving a OER's proposed LIHEAP Enhancement Charge of $0.83 per month for each customer for the calendar year 2013 taking gas and electric service. Written Order issued 1/7/13.

National Grid - Docket No. 4315 - Order 20919 approving the National Grid's proposed Standard Offer Service rates for the Residential, Commercial and Industrial Groups effective January 1, 2013. Written Order issued 1/7/13.

National Grid - Docket No. 4371 - Order No. 20918 approving a revised Long-Term Contracting for Renewable Energy Recovery Factor $0.00019 per kWh effective 1/1/13. Written Order issued 1/7/13.

National Grid - Docket Nos. 4366 & 4367 - Order No. 20911 approving Settlement of the Parties, including: 1) National Grid's 2013 Energy Efficiency Program Plan, budget and all proposed tariff provisions and EEP charges for electric and gas, effective January 1, 2013; and National Grid’s 2013 System Reliability Procurement Plan, including the 2013 budget of $343,500 and proposed incremental SRP charge of $0.00003/kWh to continue funding the Tiverton Load Curtailment Pilot and enhanced marketing, participation and technology updates effective on January 1, 2013.  Written Order issued December 21, 2012.

National Grid - Docket No. 4338 - Order No. 20905 issued to National Grid approving the October 5, 2012 Long-Term Contracting for Renewable Energy Recovery (LTCRER) Provision and LTCRER Reconciliation Provision. Written Order issued 12/20/12.

National Grid - Docket No. 4237 - Order No. 22567 issued to National Grid finding the company’s Contact Voltage Annual Report for FY 2016 in compliance with PUC's orders. Written Order issued 10/7/16.

National Grid - Docket No. D-12-12 - Order No. 20853 approving a Settlement Agreement between National Grid and the Division of Public Utilities and Carriers to authorize National Grid to issued to new long-term debt. Written Order issued 10/31/12.

National Grid - Docket No. 4343 - Order No. 20838 approving National Grid's corrections to Back-Up Service Retail Delivery Service, Tariff R.I.P.U.C. 2122. Written Order issued October 5, 2012.

National Grid - Docket No. 3617 - Order No. 20837 approving National Grid's July 20, 2013 tariff filing seeking approval of Tariff R.I.P.U.C. 2126 reinserting the Pond Street, Woonsocket Site and adding the Great Lakes Container Site to the list of Environmental Response Sites. Written Order issued October 5, 2012.



National Grid - Docket No. 4076 - Order No. 20793 dismissing National Grid's petition seeking nullification of the Town of Hopkinton's Ordinance and approving the Settlement Agreement between National Grid and Town of Hopkinton. Written Order issued 8/10/12.



National Grid - Docket No. 4315 - Order No. 20795 approving National Grid's 2013 Standard Offier Supply Procurement Plan and 2013 Renewable Energy Supply Procurement Plan. Written Order issued 8/10/12.

National Grid - Docket Nos . 4314 & 4227 - Order No. 20794 approving 1) National Grid's 2012 Electric Retail Rate Filing requesting approval of a series of charges and adjustments resulting from the Company’s annual reconciliation of its Standard Offer Service, Transmission and Transition charges; and 2) National Grid's proposed Renewable Energy Supply Charge of $0.00253/kWh effective April 1, 2012. Written Order issued 8/10/12.

Pascoag Utility District - Docket No. 4297 - Order No. 20777 approving Pascoag's request to reallocate $21,190 of 2012 DSM Program. Written Order issued 7/26/12.

National Grid - Docket No. 4316 - Order No. 20768 issued to National Grid's on the Company's March 1, 2012 Revised RFP for Long-Term Contracts for Renewable Energy Projects. Written Order issued 7/12/12.

National Grid - Docket No.4327 - Order No. 20757 approving National Grid's1st annual Revenue Decoupling Mechanism (RDM) Reconciliation Filing and proposed RDM Adjustment Factor of $0.00014 per kWh effective July 1, 2012. Written Order issued June 20, 2012.

National Grid - Docket No.4227 - Order No. 20756 approving National Grid's May 21, 2012 proposed Standard Offer Service rates effective July 1, 2012. Written Order issued 6/20/12.

National Grid - Docket No. 4206 - Order No. 20745 issued to National Grid's on the Company's October 18, 2010 Revenue Decoupling Mechanism proposal. Written Order issued 5/25/12.

National Grid - Docket No. 4319 - Order No. 20738 approving the Amended PPA between National Grid and Black Bear Development executed on May 7, 2012. Written Order issued 5/17/12.

National Grid - Docket No. 4308 - Order No. 20723 approving National Grid's December 29, 2012 proposed Long-Term Contracting for Renewable Energy Recovery (LTC-RER) Provision and Transmission Service Cost Provision , and approving a LTC-RER Factor of $0.00007 per kWh effective April 1, 2012. Written Order issued 5/3/12.

National Grid - Docket No. 4307 - Order No. 20724 approving National Grid's Revised FY 2013 Electric Infrastructure, Safety, Reliability Plan filed on December 29, 2011 and Settlement Agreement filed on January 30, 2012. Written Order issued 5/3/12.

RI Office of Energy Resources (OER) - Docket No. 4290 - Order No. 20699 approving OER's proposed LIHEAP Enhancement Charge and approving National Grid's Tariff R.I.P.U.C. No. 2079 and Tariff RIPUC NG-Gas No. 101B effective January 1, 2012. Written Order issued 4/13/12.

National Grid - Docket No. 4065 - Order No. 20702 approving the March 2, 2012 Settlement Agreement between National Grid and the Division regarding the capital structure for National Grid effective April 23, 2012. Written Order issued 4/13/12.

National Grid - Docket No. 4227 - Order No. 20698 approving Standard Offer Service rates for the Industrial Group for period April - June 2012. Written Order issued 4/12/12.

National Grid - Docket No. 4295 and Docket No. 4284 - Order No. 20697 approving 1) National Grid's 2012 Energy Efficiency Program Plan (filed on 11/1/12 in Docket No. 4295) and 2) National Grid's 3-Year (2012-2014) Energy Efficiency & System Reliability Procurement Plan (filed on 9/7/12 in Docket No. 4284). Written Order issued 4/9/12.

National Grid and RI Office of Energy Resources - Docket No. 4277 & 4288 - Order No. 20700 approving 1) NGrid's February 1, 2012 compliance filing - revised DG Enrollment Application & Process Rules for Facilities with a Nameplace Capacity of 500kW or Less and Facilities with a Nameplate Capacity Greater Than 500kW (Docket No. 4277) ; and 2) OER's February 1, 2012 compliance filing - DG Standard Contract Working Group and Proposed Forms of Contract for Small & Large DG Projects (Docket No. 4288). Written Order issued 4/11/12.

National Grid & RI Office of Energy Resources - Docket Nos. 4277 & 4288 - Order No. 20676 issued to OER regarding OER's proposed DG Standard Contract, DG Ceiling Prices and DG Classes and Targets (Docket No. 4288) and to National Grid regarding the Company's proposed DG Enrollment Application Process and Enrollment Process Rules (Docket No. 4277). Written Order issued 3/15/12.



National Grid - Docket No. 4296 - Order No. 20262 approving NGrid's 2012 SRP in the amount of $221,000 and a 6-year Load Curtailment Pilot and an incremental charge to be added to the EEP charge effective 3/1/12. Written Order issued 2/29/12. A final written Order summarizing the travel of the case and Commission's findings will follow.

National Grid - Docket No. 4268 - Order No. 20649 approving National Grid's R.I.P.U.C. No. 2075 (Net Metering Provision) and R.I.P.U.C. No. 2074 (Qualifying Facilities Power Purchase Rate) filed on July 25, 2011. Written Order issued 2/16/12.

Pascoag Utility District - Docket No. 4298 - Order No. 20637 approving Pascoag's proposed Standard Offer Service Charge of $0.05657 per kWh; Transmission Charge of $0.02393 per kWh and Transition Charge of $0.01117 per kWh for Pascoag Utility, effective for usage on or after January 1, 2012. Also approving Pascoag's supply procurement plan as required by RIGL Section 39-1-27.8. Written Order issued 1/3/12.

Pascoag Utility District - Docket No. 4297 - Order No. 20732 approving Pascoag's April 5, 2012 request to allocate $12,234 of 2011 Demand Side Management (DSM) funds to 2012 DSM. Written Order issued 5/10/12.

Pascoag Utility District - Docket No. 4297 - Order No. 20638 approving Pascoag's Demand Side Management Programs for 2012. Written Order issued 1/3/12.

National Grid - Docket No. 4185A -Order No. 20609 issued to National Grid approving Request for Waiver of the one year condition set forth in Section 8.3 of the PPA entered with Deepwater Wind. Written order issued 1/24/12.

National Grid - Docket No. 4276 - Order No. 20610 approving National Grid's Revised Amended Standards for Connecting Distributed Generation filed on October 31, 2011. Written Order issued 1/5/112.

National Grid - Docket No. 4295 - Order No. 20596 approving National Grid's Energy Efficiency Program Plan for 2012. Written Order issued 12/22/11.

National Grid - Docket No. 4218 - Order No. 20582 approving National Grid's March 2, 2011 Revised Electric ISR Plan and approving Compliance Tariffs filed on April 4, 2011. Written Order issued 12/12/11.

Pascoag Utility District - Docket No. 3546 - Order No. 20527 approving Pascoag's September 20, 2011 Request for a Waiver from Order of fully funding the Restricted Fund for 2011 and 2012. Written Order issued 11/17/11.

National Grid - Docket No. 4226 - Order 20405 approving National Grids' Retail Electric Rate Filing of February 23, 2011 and the RES Charge and Reconciliation Filing of February 28, 2011. Written Order issued 10/14/11.

National Grid - Docket No. 4149 - Order No. 20486 approving National Grid's Standard Offer Service (SOS) rates for the Industrial Group for the period October - December 2011. Written Order issued 9/30/11.

National Grid - Docket No. 4149 - Order No. 20485 approving National Grid's Standard Offer Service (SOS) rates for Industrial Group for the period July - September 2011. Written Order issued 9/30/11.

National Grid - Docket No. 4265 - Order No. 20453 approving Power Purchase Agreement between National Grid and Orbit Energy RI. Written Order issued 8/18/11.

National Grid - Docket No. 4227 - Final Report & Oder 20478 approving National Grid's 2012 SOS Procurement Plan and 2012 RES Procurement Plan. Written Order issued 9/20/11.

National Grid - Docket No. 4227 - Abbreviated Order No. 40234 approving National Grid's 2012 Standard Offer Service Procurement Plan and 2012 Renewable Energy Standard Procurement Plan. Final Report & Order will follow. Written Order issued 7/29/11. Errata Order No. 20465 issued 9/7/11.

RI Energy Efficiency Resource Management Council (EERMC) - Docket No. 4202 - Order No. 20419 approving EERMC's proposed Electric & Natural Gas Efficiency Savings Targets for National Grid for years 2012, 2013 and 2014,, and approving amended System Reliability Standards and amended Energy Efficiency Procurement Standards. Written Order issued 7/25/11.

National Grid - Docket No. 4149 - Order No. 20344 approving NGrid's SOS rates for the Industrial Group for the period April 2011 - June 2011, and SOS rates for the Residential Group and Commercial Group for the period April 2011 - December 2011. Written Order issued 5/5/11.

National Grid - Docket No. 4209 - Order No. 20591 approving NGrid's revised 2011 EEP for gas and gas EPP charge of $0.4111 per dekatherm effective 8/1/11. Written Order issued 12/16/11.

National Grid - Docket No. 4209 - Order No. 20308 decision approving 2011 Energy Efficiency Program (EEP) Plan for electric and gas, associated budgets, and electric EEP Charge of $0.00526 per kWh and gas EEP charge of $0.15 per dkthm effective January 1, 2011. Written Order issued March 14, 2011.

Pascoag Utility District - Docket No. 4211 - Order No. 20270 approving a revised Standard Offer Service rate, Transmission Charge and Transition Charge for Pascoag Utility effective January 1, 2011. Written Order issued 1/28/11.

Pascoag Utility District - Docket No. 4208 - Order No. 20269 approving Pascoag's 2011 DSM Programs. Written Order issued 1/28/11.

National Grid - Docket No. 4209 - Order No. 20236 issued to the parties' in connection with the Settlement Agreement regarding National Grid's 2011 Energy Efficiency Program Plan and asociated budget. Written Order issued 12/23/10. A final Report & Order summarizing the travel of the docket and the PUC's will follow.

National Grid - Docket No. 4200 - Order No. 20220 approving National Grid's September 3, 2010 tariff filing to amend Terms & Condition for Distribution Service. Written Order issued 12/7/10.

National Grid - Docket No. 4150 - Order No. 20215 approving a timetable and method for National Grid to solicit long-term contract for renewable energy projects pursuant to RIGL 39-26.1-1 et seq. Written Order issued 12/1/10.

Block Island Power Co. - Docket No. 4135 - Order No. 20180 approving the Town of New Shoreham's Motion for Summary Disposition of BIPCo's Proposed $0.01 per kWh Summer Only Surcharge Rate. Written Order issued 10/25/10.

National Grid - Docket No. 4041 - Order 20148 approving National Grid's August 24, 2010 compliance filing and approving revised Standard Offer Service rates for the Small Customer Group and Large Customer Group effective October 1, 2010.Writte Order issued 9/29/10.

National Grid - Docket No. 4149 - Order No. 20125 approving National Grid's 2011 Standard Offer Service and 2011 Renewable Energy Supply Procurement Plans with modifications. Written Order issued 9/23/10.

National Grid - Docket No. 4185 - Order No.. 20095 approving the Purchase Power Agreement between Narragansett Electric Company d/b/a National Grid and Deepwater Wind Block Island, LLC. Written Order Issued August 16, 2010.

National Grid - Docket No, 3569 - Order No. 20107 approving National Grid.s July 9, 2010 tariff revision to the Company's Optional Telephone Payment Provision (for electric) and Optional Credit Card Provision (gas). Written Order issued 8/26/10.

National Grid - Docket No. 4041 - Order No. 20045 filing finding National Grid's May 19, 2010 Standard Offer Procurement in compliance with Procurement Plan and approving Standard Offer Service rates for the Large Customer Group as follows: July - $0.07019 per kWh; August - $0.07372 per kWh; September - $0.06830 per kWh. Written Order issued 6/29/10.

National Grid - Docket No. 4140 - Order No. 20031 approving rates effective March 1, 2010 as follows: 1) Standard Offer Adjustment Factor of $0.00134 per kwh for the small customer group, 2) Standard Offer Adjustment Factor of $ 0.00144 per kwh for large customer group, 3) Transition Adjustment factor of $0 .00068 per kwh, 4) Transmission Adjustment Factor of $0.00001 per kwh, 5) proposed surcharge of $0.00003 per kwh applicable to G-62 and G-32 rate class. Written Order issued June 26, 2010.

Pascoag Utility District - Docket No.4173 - Order No. 20004 approving Pascoag's Net Metering Tariff Advice effective June 2, 2010 . Written Order issued May 27, 2010.

National Grid - Docket No. 4116 - Order No. 20005 approving NGrid's Revised Energy Efficiency Programs Plan for 2010. Written Order issued 5/27/10.

National Grid - Docket No. 4065 - Report and Order No. 19965A summarizing the travel of the case and Commission's findings, and authorizing National Grid to collect additional distbribution revenues of approximately $16.4 million. Written Order issued 4/29/10.

National Grid - Docket No. 4111 - Order No. 19941 rejecting the Purchase Power Agreement between National Grid and Deepwater Wind Block Island. Written Order issued 4/2/10.

National Grid - Docket No. 4116 - Order No. 19894 rejecting the Stipulation and Settlement regarding National Grid's Energy Efficiency Program Plan and associated budget for 2010. Written Order issued 2/3/10.

Review Into the Adequacy of Renewable Energy Supplies Pursuant to R.I.G.L. 39-26-6 - Docket No.4050 - Order No. 19893 determining that there is potential adequacy of renewable energy supplies to meet the increase in the percentage requirement of energy from renewable energy resources to go into effect in 2011. Written Order issued 1/29/10.

Rules and Regulations Governing a Long-Term Contracting Standard for Renewable Energy - Docket No. 4069 - PUC issues Report Order No. 19892 summarizing comments and rationale for adoption of new rules. Report issued 1/29/10.

Pascoag Utility District - Docket No. 4137 - Order No. 19889 approving Pascoag's amended street lighting tariff. Written Order issued 1/25/10.

Pascoag Utility District - Order No. 19883 approving Pascoag's Standard Offer Charge of $0.07655 per kWh, Transmission Charge of $0.02008 per kWh, and Transition Charge of $$0.01158 per kWh effective January 1, 2010. Also, approving Pascoag's Supply Procurement Plan. Written Order issued 12/23/09.

Pascoag Utility District - Docket 4130 - Order No. 19882 approving Pascoag's 2010 Demand Side Management Programs and associated budget. Written Order issued 12/23/09.

Pascoag Utility District - Docket 3569 - Order No. 19881 granting Pascoag's request to extend the waiver from Credit Card Regulations until July 1, 2010. Written Order issued 12/23/09.

National Grid - Docket No. 4111 - Order No. 19871 approving Second Revised Procedural Schedule in connection with the Company's Proposed Town of New Shoreham Project - Written Order issued 12/23/09.

National Grid - Docket No. D-09-49 - Report and Order No. 19847 approving a Settlement Agreement executed between National Grid and the Division of Public Utilities regarding the company's proposed issuance and/or sale of long-term debt. Written Order issued 12/9/09.

National Grid - Docket No. 4041 - Order No. 19880 approving National Grid's November 19, 2009 compliance filing regarding 2010 SOS Procurement Plan for Large C&I Group and approving SOS rates for Large Customer Group for period January - March 2010. Written Order issued 12/23/09.

National Grid - Docket 4041 - Order No. 19878 approving a Renewable Energy Supply Charge of $0.00123 per kWh effective March 1, 2010. Written Order issued 12/23/09.



National Grid - Docket No. 4041 - Report and Order No. 19839 approving National Grid's 2010 RES Procurement Plan, 2010 SOS Procurement Plan for Large C&I Group, and 2010 SOS Procurement Plan for Small Customer Group and further modification to the plan. Written Order issued 11/24/09. Errata Order No. 19846 issued 12/7/09.

National Grid - Docket No. 4079 - Report and Order No. 19821 approving National Grid's amended Qualifying Facilities Power Purchase Rate, R.I.P.U.C. No. 2031 filed on September 18, 2009. Written Order issued 11/4/09.

Consideration of Smart Grid Investments Pursuant to PURPA and EISA - Docket No. 4052 - Order No. 19766 to close the docket because the requirements of the EISA have or are being considered in other dockets. Written Order issued 9/22/09.

National Grid - Docket No. 4065 - Order No. 19711 granting in part the Division of Public Utilities and Carriers' June 9, 2009 Motion to Amend Schedule. Written Order issued 7/16/09. Errata Order No. 19722 to correct clerical error in Order No. 19711.

National Grid - Docket No. 4036 - Order No. 19674 issued to National Grid approving the Company's petition to exercise eminent the right of eminent domain - Cottrell. Written Order issued June 25, 2009.

National Grid - Docket No. 4041 - Order No. 19640 approving National Grid's April 9, 2009 proposed Accelerated 2010 Standard Offer Procurement Plan with modification. Written Order issued 5/7/09.



National Grid - Docket No. 4041 - Order No. 19610 issued to National Grid in Response to the Company's Moiton for Clarification of Order No. 19602. Written Order issued 4/6/09..



National Grid - Docket No. 4041 - Order No. 19602 rejecting National Grid's proposed Standard Offer Supply Procurement Plan and Renewable Energy Supply Procurement Plans. National Grid is directed to re-file the Procurement Plans. Written Order issued 3/18/09.



National Grid - Docket No. 4011 - Order No. 19623 approving a Standard Offer Service Rate of 9.2¢ per kWh, a Transmission Rate of 1.064¢ per kWh and a Transition Rate of 0.235¢ per kWh effective January 1, 2009. Written Order issued 4/20/09.

National Grid - Docket No. 3931 - Order No. 19621 approving National Grid's Least Cost Procurement Plan filed on September 2, 2009 consisting of the 2009-2011 Energy Procurement Plan and System Reliability Procurement Plan. Written Order issued 4/17/09.

Pascoag Electric Utility - Docket No. 3569 - Order No. 19612 granting Pascoag's request to waive credit card processing fee. Written Order issued 4/7/09.

National Grid - Docket No. 4000 - Order No. 19608 approving the Parties' Settlement Agreement regarding National Grid's Gas and Electric Energy Efficiency Program Plan for 2009. Written Order issued 4/6/09.

National Grid - Docket No. 3999 - Order No. 19590 issued to National Grid approving a revised Qualifying Facilities Power Purchase Rate effective January 1, 2009. Written Order issued 3/11/09.

Pascoag Utility District - Docket No. 4005 - Order No. 19584 issued to Pascoag approving Demand Side Management Programs and associated budget for 2009. Written Order issued 2/26/09.

Pascoag Utility District - Docket No. 4006 - Order No. 19583 issued to Pascoag Utility District approving a revised Standard Offer Charge, Transmission Charge and Transition Charge effective January 1, 2009. Written Order issued 2/26/09.

National Grid - Docket No. 4012 - Order No. 19580 approving National Grid's Renewable Energy Standard Procurement Plan and a RES charge of 0.093 per kWh effective 1/1/09. Written Order issued 2/25/09.

National Grid - Docket No. 3605 - Order No. 19572 approving National Grid's market assessment report to continue to procure LRS for the period April 2009 - December 2009 under the current LRS Acquisition Plan. Written Order issued 2/13/09.

Block Island Power Co. - Docket No. 3900 - Order No. 19504 approving new rates and authorizing BIPCo to collect additional revenues of $263,856 for a total cost of service of $2,607,548 effective June 1, 2008. Written Order issued 11/14/08.

National Grid - Docket No. 3969 - Order No. 19466 approving a Settlement Agreement between Narragansett Electric Co. d/b/a NGrid, Constellation and the Division of Public Utilities and Carriers filed on September 2, 2008 . Written Order issued 10/21/08.

National Grid - Docket No. 3960 - Order No. 19378 approving an increase to the Standard Offer Rate from 9.2¢ per kWh to 12.4¢ per kWh effective July 15, 2008 through December 31, 2008. Written Order issued 8/20/08.

National Grid - Docket No. 3605 - Order No. 19368 approving NGrid's proposal to procure Last Resort Service for period November 2008 through April 2009 in accordance with the Acquisition Plan. Written Order issued 8/8/08.

Pascoag Utility District - Docket No. 3896 - Order No. 19361 approving Pascoag's proposed realignment of the SO rate at $0.0594 per kWh, transition charge at $0.01662 per kWh and transmission charge at $0.02440 per kWh effective August 1, 2008. Written Order issued 8/6/08.

Proposed Standards for Energy Efficiency and Conservation Procurement & System Reliability - Docket No. 3931 - Report and Order No. 19344 issued to the RIEERMC's approving proposed standards for system reliability and energy efficiency and conservation procurement as amended. Written Order issued on July 17, 2008.

National Grid - Docket No. 3904 - Order Order No. 19274 approving National Grid's proposed new Standards for Connecting Distributed Generation, RIPUC No. 2007 and Qualifying Facilities Power Purchase Rate, RIPUC Tariff No. 1078-A. Written Order issued 4/22/08. Errata Order 19281 issued to National Grid to correct a mistake in Order No. 19274. Written Order issued 5/2/08.

RI Resource Recovery Corp. (RIRRC) - Docket No. 3565 - Order No. 19273 denying RIRRC's request for declaratory ruling for exemption from the definition of "public utility", "electric distribution company" or "distribution facility". Written Order issued 4/21/08.



National Grid - Docket No. 3901 - Order 19239 issued to National Grid approving Renewable Energy Standard (RES) procurement plan and RES charge of 0.084¢ effective 1/1/08. Written Order issued 3/7/08.

National Grid - Docket No. 3902 - Order No. 19202 issued to National Grid approving a Standard Offer Service rate of 9.2¢, Transmision Service Charge of $0.541¢ and Transition Charge of 0.322¢ per kWh. Also approving a credit of 1.306¢ to A-60 rate on first 450 kWh. The rates are approved effective 1/1/08. Written Order issued 2/2/08.

Rules Governing the Termination of Residential Electric, Gas and Water Utility Service - Docket No. 3876 - Order No. 19922 issued in response to the comments received and providing rationale for adopting or not adopting comments regarding the PUC's amendment to the termination rules. New amended termination rules were adopted for effect March 1, 2008. Written Order issued 3/5/08.

Pascoag Electric Co. - No. Order No. 19221 approving a revised Standard Offer Service Rate, Transmission Charge and Transition Charge effective 1/1/08. Written Order issued 3/5/08.

Pascoag Utility District - Docket No. 3888 - Report and Order No. 19180 approving Pascoag's 2008 DSM Programs with an overall budget of $116,000. Written Order issued 1/17/08.

National Grid - Docket No. 3892 - Report and Order No. 19179 approving a Settlement Agreement to provide National Grid an overall budget of $21,015,200 to implement Demand Side Management for 2008. ritten Order issued 1/17/08.

National Grid - Docket No. 3765 - Order No. 19801 approving National Grid's proposed Renewable Energy Standard ("RES") rate of 0.062 cents per kWh effective January 1, 2007, National Grid's RES Procurement Plan and directing the Company to file a proposed 2008 RES Procurement Plan by November 15, 2007. Order issued 10/17/07.

Pascoag Utility District - Docket No. 3776 - Order No. 19098 granting Pascoag's request to reallocate 2007 DSM funds. Order issued 10/12/07.

Block Island Power Co. - Docket No. D-07- 44 - Order No. 19095 approving BIPCO's request for consent and approval to obtain a loan. Order issued 10/10/07.

National Grid, Block Island Power and Pascoag Utility District - Docket Nos. 3804 and 3806 - Order No. 18055 granting utilities' Request for Relief from Order No. 18943 in connection with the Affordable Energy Plans. Order issued 8/31/07.

National Grid - Docket No. 3605 - Order No. 19050 approving NGrid's proposal to continue to procure Last Resort Service (LRS) power for residential and non-residential customers for the six-month period November 1, 2007 through April 30, 2008 in accordance with the LRS Acquisition Plan. Order issued 8/31/07. Errata Order No. 19061 issued 9/7/07.

Pascoag Utility District - Docket No. 3846 - Order No. 19032 approving Pascoag’s tariff advice to amend tariff entitled Large Commercial and Industrial Rate effective July 26, 2007. Order issued 8/10/07.

National Grid - Docket No. 3790 - Order No. 19024 approving the Company's Demand Side Management Programs and budget for years 2007 and 2008. Order issued 7/23/07.

National Grid - Docket No. 3628 - Order No. 19020 approving Amended Settlement of the National Grid and Division to modify benchmarks in Company's Service Quality Plan. Order issued 7/13/07.

Pascoag Utility District - Docket No. 3709 - Order No. 19005 approving Pascoag's request to re-align the standard offer, transition and transmission rates and to establish a Purchase Power Restricted Fund. Order issued 7/6/07.

National Grid, Block Island Power Co. and Pascoag Utility District - Docket Nos. 3804 and 3806 - Order No. 18973 approving Affordable Energy Plans for low-income household customers of National Grid, Block Island Power Co. and Pascoag Utility District. Order issued 5/31/07.

National Grid - Docket No. 3830 - Order No. 18956 approving National Grid's tariff advice filing to amend GreenUp Service Terms and Conditions, effective 11/12/07. Order issued 5/11/07.

The George Wiley Center - Docket No. 1725 - Order No. 18941 denying the Wiley Center's request for a two-week extension of the winter moratorium until May 1, 2007. Written Order issued 5/3/07.

Block Island Power Co. - Docket No. D-07-08 - Order No. 18936 approving BIPCO's petition to obtain a $600,000 secured loan from the RUS/FFB for the purpose of refinancing Engine No. 25. Written Order issued 4/26/07.

Pascoag Utility District - Docket No. 3569 - Order No. 18905 denying Pascoag's request for a waiver from the rules governing the acceptance of credit cards. Written Order issued 3/19/07.



Rules and Regulations Governing the Termination of Residential Electric, Gas and Water Service - Docket No. 3761 - Order No. 18887 on comments and rationale for amending the rules governing the termination of residential utility service to add a provision for "Summer Moratorium". Written Order issued 3/5/07.

National Grid - Docket No. 3605 - Order No. 18882 approving NGrid's proposal to continue to procure Last Resort Service (LRS) power for residential and non-residential customers for the six-month period May 1, 2007 through October 31, 2007 in accordance with the LRS Acquisition Plan. Written Orde issued 2/26/07.

National Grid - Docket No. 3788- Order No. 18878 approving revised rates for NGrid, effective 1/1/07 as follows: SO rate of 8.3¢ per kWh, transition rate of 0.559¢ per kWh; transmission adjustment factor of 0.474¢ per kWh; and further directing NGrid to return an additional $2 million of CTC Settlement Funds to the A-60 rate class through an additional per kWh reduction to the already reduced distribution charge on the first 450 kWh of use. Written Order issue 2/22/07.



National Grid - Docket No. 3779 - Order No. 18858 approving a Settlement Agreement (Appendix A attached to Order) providing National Grid with an overall budget of approximately $22,527,800 to implement Demand Side Management and services for 2007. Written Order issued 2/5/07

Pascoag Utility District - Docket No. 3776 - Order No. 18827 approving Pascoag Utility District's 2007 DSM Programs with an overall budget of $147,000. Written Order issued 1/11/07.

National Grid - Docket No. 3739 - Order No. 18794 approving a Standard Offer Rate of 9.4¢ for National Grid effective 9/1/06. Written Order issued 12/27/06.

National Grid - Docket No. 3771- Order No. 18787 denying National Grid’s request to change its designation of on-peak/off-peak hours; and ordering that the current tariff language remain in effect. Written issued 12/13/06.

National Grid - Docket No. 3716 - Order No. 18775 approving National Grid's updated and increased centerline foot costs for its line extension policies as submitted on March 1, 2006. Written Orde issued 11/17/06.

Pascoag Utility District - Docket No. 3763 - Order No. 18776 denying Pascoag's tariff filing to add language to limit the motor horsepower size to be installed under the Residential Rate A, and approved the rate with modified language as recommended by Division. Written Order issued 11/16/06.

Pascoag Utility District - Docket 3709 - Order No. 18723 approving Pascoag's revised rates for Standard Offer SO, Transmission and Transition effective August 1, 2006. Written Order issued 9/27/06

National Grid - Docket 3746 - Order No. 18714 approving National Grid's tariff advice filing to amend the Basic Residential Rate A-16. Written order issued 9/8/06.

Narragansett Electric Co. d/b/a National Grid - Docket No. 3605 - Order No. 18699 approving Narragansett Electric's procurement of Last Resort Service for period November 1, 2006 - April 30, 2007. Written Order issued 8/23/06.

Narragansett Electric Co. d/b/a National Grid - Docket No. 3732 - Order No. 18698 recommending to the Energy Facility Siting Board that there is a need to construct the Narragansett Electric's proposed Southern Transmission Project and its cost is reasonable and justified. Written Order issued 8/23/06.

Narragansett Electric Co. d/b/a National Grid and Southern Union Co. (New England Gas Co.) - Docket No. D-06-13 - Report and Order No. 18676 approving the purchase by the Narragansett Electric Company of the assets associated with the regulated gas distribution business owned and operated by Southern Union Company in Rhode Island as the New Gas Company. Written Order issued 7/25/06.

Narragansett Electric Co. d/b/a National Grid and Southern Union Co. (New England Gas Co.) - Docket No. D-06-13 - Order No. 18659 denying the Attorney General's Motion to Compel Southern Union to Answer Third Set of Data Requests. Written Order issued 6/30/06.

Narragansett Electric Co. d/b/a National Grid and Southern Union Co. (New England Gas Co.) - Docket No. D-06-13 - Order No. 18657 denying the Attorney General's Motion to Compel Southern Union Document Production & Request for Preliminary Examination. Written Order issued 6 /27/06.

Narragansett Electric Co. d/b/a National Grid and Southern Union Co. (New England Gas Co.) - Docket No. D-06-13 - Order No. 18641 in response to the several motions to compel the utilities to respond to data requests. Written Order issued 6/16/06.

Narragansett Electric Co. d/b/a National Grid and Southern Union Co. (New England Gas Co. ) - Docket No. D-06-13 - Order No. 18626 denying the City of East Providence's Motion for Stay and Request for an Emergency Hearing. Written Order issued 6/1/06.

Narragansett Electric Co. d/b/a National Grid and Southern Union (New England Gas Co.) - Docket D-06-13 - Order No. 18620 granting the Attorney General's request for extension of deadline on discovery Written order issued 5/26/06.

Narragansett Electric Co. d/b/a National Grid and Southern Union (New England Gas Co.) - Docket D-06-13 - Order No. 18591 in response to the various motions to intervene filed by the parties concerning the proposed acquisiton or merger by the companies. Written order issued 5/4/06.

Block Island Power Co. - Docket No. 3655 - Order No. Order No. 18570 rejecting the Town of New Shoreham's Motion for Summary Rejection of BIPCo's Management Compensation Compliance Filing and accepting BIPCO's compliance filing on management compensation. Order issued 4/17/06.

Narragansett Electric Co. d/b/a National Grid - Docket No. 3716 - Order No. 18536 approving National Grid's proposed revision to Line Extension Policies effective February 1, 2006. Order issued 2/27/06.

Narragansett Electric Co. d/b/a National Grid - Docket No. 3701 - Report & Order No. 18516 approving a Settlement of the Parties addressing National Grid's Demand Side Management Programs and budget for 2006 with modification. Order issued 1/26/06.

National Grid - Docket No. 3710 - Report and Order No. 18510 authorizing National Grid to dispense $16.5 million of settlement proceeds as follows: 1) to allocate $8.5 million of the settlement proceeds to ratepayers through the Transition Charge over one year; and 2) to allocate $2 million (of the $8 million proposed for a low income discount program) to be applied to the first 450 kWh of usage per month for customers taking service under the low income Rate A-60 for one year; and 3) dispensation of the remaining $6 million is held in abeyance for future action. Order issued 1/24/06.

National Grid - Docket No. 3706 - Report and Order No. 18509 approving revised rates for National Grid. Approving a Standard Offer rate of 10.0 per kWh; Transition Charge of 0.575 per kWh; and Transmission Adjustment Factor of 0.371 per kWh effective 1/1/06. Order issued 1/24/06.

Pascoag Utility District - Docket No. 3709 - Report and Order No. 18508 approving revised rates for Pascoag Utility District. Approving a Standard Offer rate of $0.07206 per kWh; Transition Charge of $0.0119 per kWh; and Transmission Charge of $0.01005 per kWh effective 1/1/06. Order issued 1/23/06.

Pascoag Utility District - Docket No. 3700 - Report and Order No. 18507 approving Pascoag's 2006 Demand Side Management programs & budget. Order issued 1/23/06.

Narragansett Electric Co. d/b/a National Grid - Docket 3605 - Order 18495 approving National Grid's procurement of Last Resort Service for period March 1 - October 31, 2006, and approving the Company's Contingency Plan filed on 11/1/05. Order issued 1/11/06.

Implementation of a Renewable Energy Standard (RES) Rulemaking - Docket No. 3659 - Final Report (Order No. 18485) regarding comments received on proposed RES rules - Order issued 12/28/05.

Narragansett Electric Co. d/b/a National Grid - Docket 3689 - Order No. 18473 approving Company's proposed increase to the Standard Offer Service Rate to 8.2¢ per kWh effective October 1, 2005. Written order issued 12/14/05.

Narragansett Electric Co. d/b/a National Grid - Docket 3617 - Order No. approving Company's request for extension of the Customer Credit until 12/31/05. Written order issued 11/18/05.

Block Island Power Co. - Docket 3655 - Errata Order No. 18500 issued to Block Island Power to correct Report and Order 18364. Order issued 1/17/06.

Pascoag Utility District - Docket No. 3685 - Order No. 18352 approving Pascoag's filing to amend its Large Commercial and Industrial Demand Charge. Written order issued 9/1/05.

Block Island Power Co. - Docket 3655 - Order No. 18364 authorizing Block Island Power to collect additional revenues of $219,047 for a total rate year base revenue requirement of $2,328,304 and approving new rates effective June 1, 2005. Written order issued 9/13/05.

Narragansett Electric Co. c/b/a National Grid - Docket 3680 - Order No. 18267 approving Narragansett's proposed 2005 Summer Load Curtailment Program. Written Order issued 6/6/05.

Narragansett Electric Co. d/b/a National Grid - Docket 3679 - Order No. 18363 approving Company's tariff advice filing to amend Terms & Conditions for Non-regulated Power Producers to permit electronic exchange between Narragansett and suppliers. Written order issued 9/12/05.

Narragansett Electric Co. d/b/a National Grid - Docket 3678 - Order No. 18266 approving Narragansett's proposed amendment to R.I.P.U.C. Nos. 1192 and 1193, Terms and Conditions to allow for Off Cycle Meter Reads and other minor changes. Written order issued 6/6/05.

Pascog Utility District - Docket 3657 - Order No. 18312 approving tariff advice request to change Pascoag's request to change the reconciliation filing requirements for SO, transmission and transition from semi-annual to annual reconciliation (7/29/05)

Pascoag Utility District - Docket 3657 - Order 18306 approving request to keep current Standard Offer Service Rate, Transmission Charge and Transition Charge in effect through January 31, 2006. Order issued 7/21/05.

Narragansett Electric Co. - Docket 3628 - Order 18294 approving a Settlement Agreement to incorporate a new Service Quality Plan for effect January 1, 2005. Order issued 7/12/05.

Narragansett Electric Co. - Docket 3605 - Order 18250 approving Narragansett's proposal to continue to procure Last Resort Service under the terms of the approved Acquisition Plan; and to procure power for residential and non-residential customers for the six-month period, September 1, 2005 through February 28, 2006, with the option for additional procurements for residential customers in accordance with the terms of the Acquisition Plan. Order issued 5/24/05.

Pascog Utility District - Docket 3657 - Order No. 18312 approving tariff advice request to change Pascoag's request to change the reconciliation filing requirements for SO, transmission and transition from semi-annual to annual reconciliation (7/29/05)

Pascoag Utility District - Docket 3657 - Order 18306 approving request to keep current Standard Offer Service Rate, Transmission Charge and Transition Charge in effect through January 31, 2006. Order issued 7/21/05.

Narragansett Electric Co. - Docket 3628 - Order 18294 approving a Settlement Agreement to incorporate a new Service Quality Plan for effect January 1, 2005. Order issued 7/12/05.

Narragansett Electric Co. - Docket 3605 - Order 18250 approving Narragansett's proposal to continue to procure Last Resort Service under the terms of the approved Acquisition Plan; and to procure power for residential and non-residential customers for the six-month period, September 1, 2005 through February 28, 2006, with the option for additional procurements for residential customers in accordance with the terms of the Acquisition Plan. Order issued 5/24/05.

Pascoag Utility District - Docket 3474 - Order 18249 approving Pascoag's request to allocate Demand Side Management programs funds. Order issued 5/24/05.

Energy Source Disclosure Rulemaking - Docket 3642 - Commission Report on Final Rules. Order issued 3/1/05.

Block Island Power Co. - Docket 3655 - Order 18157 denying the Block Island Sustainability Coalition (BISC) Motion to Intervene. Order issued 2/18/05.

Narragansett Electric Co. - Docket 3635 - Order 18152 approving 2005 Demand Side Management Programs and budget. Order issued 2/17/05.

Narragansett Electric Co. - Docket 3648 - Order 18151approving (maintain at current level) Standard Offer rate at 6.7 cents kWh and (decrease) Transition Charge at 0.845 cents effective January 1, 2005. Order issued 2/17/05.

Pascoag Utility District - Docket No. 3657 - Order 18153 approving a Standard Offer rate at 5.482¢ per kWh, a Transition Charge at 0.234¢ per kWh and a Transmission Charge at 1.043¢ per kWh effective February 1, 2005. Order issued 2/17/05.

Scott Pollard Complaint Against Narragansett Electric Co. - Docket 3643 - Order 18101 in response to compliant regarding Line Extension Policy. Order issued 12/22/04.

Narragansett Electric Co. - Docket 3617 - Order No. 18037 approving Second Amended Stipulation and Settlement between Narragansett Electric, Division of Public Utilities, Dept. of Attorney General, The Energy Council of RI, the US Dept. of Navy and People's Power & Light. The Settlement resolves issues associated with Narragansett's distribution rates and rate design during the period October 28, 2004 through December 31, 2009. Order issued November 9, 2004.

Narragansett Electric Co. - Docket 3571 - Order 17972 approving a Standard Offer Service of 6.7 cent per kWh effective August 1, 2004. Order issued August 26, 2004.

Narragansett Electric Co. - Docket D-04-16 - Order 17957 granting Narragansett's request to initiate a rulemaking procedure to modify existing Rules Prescribing Standards for Electric Utilities and approving new regulations. Order issued August 18, 2004.

Pascoag Utility District - Docket 3580- Order 17931 dismissing Standard Offer, transmission and transition tariff filing. Order issued July 29, 2004.

Narragansett Electric Co. - Docket 3463 - Order 17927 approving Company's 2004 Demand Side Management Programs and budget. Order issued July 28, 2004.

Miles Avenue Property LLC Complaint Against Narragansett Electric Co. - Docket D-03-10 - Order 17818 Order denying Miles Ave. Property's complaint that Narragansett refused to provide overhead electric service to property owned. Order issued July 14, 2004.

Narragansett Electric Co.- Docket 3605- Order 17903 approving Last Resort Service Acquisition Plan for period September 1, 2004 - February 28, 2005 and optional periods for residential customers. Order issued July 12, 2004.

Narragansett Electric Co. - Docket 3608 - Order 17902 approving proposed 2004 Summer Load Relief Program. Order issued July 8, 2004.

Pascoag Utility District - Docket 3474 - Order 17901 approving request to re-allocated Demand Side Management (DSM) funds. Order issued July 8, 2004.

Pascoag Utility District - Dockets 3546 & 3580 - Order 17820 approving Settlement Agreement to provide additional revenues of $163,039 or 10.1% over present rate revenues and new rate design. Also, approving a Standard Offer Service charge of $0.05167 per kWh, transition rate of $0.00701 per kWh and transmission rate of $0.00937 per kWh effective February 1, 2004. Order issued May 5, 2004.

Rules & Regulations Governing the Termination of Gas and Electric Service - Docket 1725 - Order 17805 denying the George Wiley Center request for extension of the winter moratorium from April 15 to April 20. Order issued April 16, 2004.

Narragansett Electric Co. - Dkt. 3571 - Order No. 17800 approving a Standard Offer Service rate of 5.9 cents per kWh, transition rate of .855 cents per kWh and transmission rate of .478 cents per kWh for effect 01/01/04. Order issued March 31, 2004.

Narragansett Electric Co. Dkt. 3534 - Order No. 17753 approving Narragansett's GreenUp Program designed to introduce new opportunities for Standard Offer Service & Last Resort Service customers to voluntarily support the growth of renewable energy resources and to expand the number of retail suppliers offering renewable energy alternatives.  Order issued February 16, 2004. 

Narragansett Electric Co. Dkt. 3515 - Order No. 17752 approving Narragansett's request to continue Last Resort Acquisition Plan for purposes of procuring power for non-residential customers for period March 1, 2004 - August 31, 2004.  Order issued February 16, 2004. 

Narragansett Electric Co. Dkt. 3564  - Order No. 17690 Advisory Opinion to the Energy Facility Siting Board Regarding the Need, Cost and Safety of  Narragansett Electric Companys Proposal to Relocate Transmission Lines Between the Cities of Providence and East Providence Which Application is Pending Before the EFSB.  Opinion issued 01/27/04.

Narragansett Electric Co. Dkt. 3551  - Order No. 17644 approving a settlement agreement entered between Narragansett Electric and the Dept. of Navy to place the Newport Naval Station on Narragansett Electric Rate G-62 effective January 1, 2004. Order issued December 23, 2003. 

Pascoag Utility District - Dkt. 3474 - Report & Order No. 17642 approving 2004 Demand Side Management Programs and budget.  Order issued 12/22/03.

Rules & Regulations Governing the Termination of Gas and Electric Service - Dkt. 1725 - Order No. 17617  Order denying the George Wiley Center's Petition for Emergency Relief to temporarily adopt changes to the existing regulation, specifically, modify the rule requiring a 25% down payment on arrearages and permit a lower down payment for the restoration of service.  Order issued November 21, 2003.

Narragansett Electric Co. Dkt. 3496  - Order No. 17592 approving Narragansett's request to recover cost associated with an amendment to its Standard Offer Supply Contract.  Order issued October 28, 2003. 

Pascoag Utility District - Dkt. 2861 - Report & Order No. 17553 approving Standard Offer Service charge of $0.05619 per kWh, transition rate of $0.01345 per kWh and transmission rate of $0.00453 per kWh for effect 07/09/03. Order issued September 4, 2003

Narragansett Electric Co. Dkt. 3515 - Order No. 17532 approving Last Resort Acquisition Plan covering the six-month period, Sept. 1, 2003 - Feb. 28, 2004; and optional second period Mar1, 2004 - Aug 31, 2004.  Order issued August 6, 2003. 

Narragansett Electric Co. (DSM) Dkt. 3463 - Order No. 17516 approving a Settlement Agreement executed by Narragansett Electric, Division of Public Utilities, The Energy Council of RI, The State Energy Office and the Coalition for Consumer Justice concerning Narragansett Electric Demand Side Management calendar 2003.   Order issued July 21, 2003.

Narragansett Electric Co. - Dkt. 3508 - Order No. 17495  approving a Standard Offer Service rate 5.5 cents per kWh for effect 06/01/03.   Order issued June 20, 2003.

Pascoag Utility District - Dkt. 3474 - Report & Order No. 17464  approving request for reallocation of DSM funds.  Order issued May 21, 2003

Pascoag Utility District - Dkt. 2861 - Report & Order No. 17436 approving Standard Offer Service rate of $0.03431 per kWh, transition rate of $0.01892 per kWh and transmission rate of $0.00701 per kWh for effect 02/06/03. Order issued April 22, 2003.

Narragansett Electric Co. - Dkt. 3479 - Order No. 17424 approving a Standard Offer Service rate of 4.662 cents per kWh, transition rate of .944 cents per kWh and transmission rate of .063 cents per kWh for effect 01/01/03. Order issued April 11, 2003.

Narragansett Electric Co. - Dkt. 2930 - Order No. 17354 approving the Company's request to apply property tax saving to the Environmental Response Fund.  Order issued 01/29/03.

Narragansett Electric Co. - Dkt. 3444 - Report & Order No. 17355 directing the Company to eliminate the 4.5 cents per kWh rate floor for non-residential Last Resort Service customers.  Order issued 01/29/03.

Narragansett Electric Co. - Dkt. 3444 - Report & Order No. 17203 approving Last Resort Service Acquisition Plan.  Order issued 10/22/02.

Pascoag Utility District - Dkt. 3474 - Report & Order No. 17346 approving 2003 Demand Side Management Programs and budget.  Order issued 01/23/03.

Pascoag Utility District - Dkt. 2510 - Report & Order No. 17104 approving 2002 Demand Side Management Programs and budget.  Order issued 08/20/02.

Narragansett Electric Co. - Dkt. 3240 - Report & Order No. 17106 approving 2002 Demand Side Management Programs and budget.  Order issued 08/20/02.

Narragansett Electric Co. Petition for Declaratory Judgment Regarding Station Service Delivery Charges Assessed to USGen New England, Inc. - Docket No. 3342 - Order 17108 approving 1) Settlement and Stipulation between Narragansett and USGen and 2)  resolving station service delivery charges and 3) the creation of a new Station Power Delivery and Reliability Service Rate M-1.   Order issued 08/20/02.

Pascoag Utility District - Dkt. 2861 - Order No. 17120 approving Standard Offer Charge of $0.04514 per kWh, Transmission Charge of $0.00487 per kWh and Transition Charge of $0.00641 per kWh effective August 1, 2002 . Order issued 09/05/02.

Request to Amend Rules & Regulations Governing the Termination of Residential Electric, Gas, and Water Utility- Docket 3426 - Order 16966 approving amendments to current regulations. Order issued April 16, 2002.

Pascoag Utility District - Dkt. 2681 - Order No. 17055 approving Standard Offer Charge of $0.04602 per kWh, Transmission Charge of $0.00687 per kWh and Transition Charge of $0.01722 per kWh effective for bills rendered on or after February 1, 2002 .  Order issued 07/11/02.

Narragansett Electric Co. - Dkt. 3005 - Order No. 16920 approving Last Resort Service rate for periods May 2001 - August 2001, and September 2001 - August 2002.  Errata Order No. 16929.



Narragansett Electric Co. - Dkt. 3402 - Order No. 16916 approving rate reductions to Standard Offer Rate, Transition Charge and Transmission Adjustment Factor for effect January 1, 2002.

Pascoag Utility District - Dkt. 2861 - Order No. 16832 approving revised Standard Offer Service rate, transmission and transition charge for period 11/01/01 - 01/31/02.   

Narragansett Electric Co. - Dkt. 3240 - Order No. 16903  granting the Company an extension to file proposed 2002 DSM and renewables energy programs, and authorizing the continuation of the current 2001 DSM and renewable energy programs.  Order issued on 01/30/02. 

Narragansett Electric Co. - Dkt. 3240 - Order No.16798 approving a Stipulation to implement Demand Side Management and renewable energy programs and approve budget for year 2001.  Issued 11/29/01.



Narragansett Electric Co. - Dkt. 2867 - Order No. 16752 - approving as Stipulation and Settlement Agreement to implement a High Voltage Service Rate H-72, High Voltage Back-Up Service Rate B-72 and Electric Propulsion Rate X1, issued on 10/26/01.

Pascoag Utility District - Dkt. 2510 - Order No. 16724 approving Demand Side Management budget and programs for 2001.  Issued 09/24/01.



Narragansett Electric Co. - Dkt. 3379 - Order No. 16731 approving a reduction to the Standard Offer Service Rate effective October 1, 2001.  Issued 10/02/01.



Pascoag Utility District - Dkt. 2681 - Order No.16689 approving a request to maintain the currents Standard Offer Service rate, transmission and transition charges in effect..   Issued 08/21/01.



Narragansett Electric Co. - Dkt. 3287 Order  No. 16651 approving Standard Offer Service Rate and other adjustments effective April 1, 2001.  Order issued 06/10/01.



Narragansett Electric Co. - Dkt. 3005 Order No.16638 approving the Selection of the Last Resort Service Supplier for period November 2000 - April 2001.  Issued 06/14/01.



Narragansett Electric Co. - Dkt. 3243 Order No. 16636 approving Standard Offer Service Rate, transition charge and transmission adjustment factor effective 01/01/01 (through 03/31/01). Errata Order 16931.



Narragansett Electric Co. - Dkt. 3138   Order No. 16635 approving Standard Offer Service Rate and Standard Offer Adjustment Factor for period September 1, 2000 - December 31, 2000.  Issued 06/13/01.



Pascoag Fire District - Dkt. 2861   Order No. 16637 approving Standard Offer Service rate, transmission and transition charges effective 02/01/01.  Issued 06/14/01.

US Dept. of Navy Petition for Declaratory Judgment - Dkt.  3132   Order denying the Navy's petition declaring that it is entitled to be placed on Narragansett Electric Company's rate schedule G-62 instead of the new N-01 rate approved by the Commission as a result of the merger settlement in Dkt. 2930.  Order No. 16437 issued 10/30/00.

Pascoag Fire District - Dkt. 2861   Order approving request for waiver of the six-month reconciliation of the Standard Offer Charge, Transmission Charge and Transition Charge and request to continue the existing charges through January 31, 2001.  Order No. 16392 issued 09/22/00.

Indeck-North Smithfield LLC - Dkt. 3094    Need Assessment Advisory Opinion to Energy Facility Siting Board regarding Indeck-North Smithfield's proposal to construct a power production facility.  Order No. 16388 issued 09/06/00.



Block Island Power Co. - Dkt. 1998   Order authorizing BIPCO to continue the collection of the environmental remediation surcharge at $0.00729 per kWh through April 30, 2001.  Order   No. 16365 issued 08/28/00.



Block Island Power Co. - Dkt. 1980   Order authorizing BIPCO to recover urea and fuel through the Fuel Adjustment Clause.  Order No. 16366 issued on 08/28/00.



Narragansett Electric Co. - Dkt. 3138 Order No. 16305 approving Standard Offer Service rate or 4.1� per kWh effective July 1, 2000 issued on 06/30/00.



Narragansett Electric Co. - Dkts. 3117 &  3005 (Last Resort Service Rate)   Final Report & Order approving LRS rate for non-residential customers and Company's selection of the Last Resort Service power supplier.  Order No. 16281 issued June 16, 2000.



Narragansett Electric Co. - Dkt. 3117 (Last Resort Service Rate)   Order approving LRS rate for the period June 1 - August 31, 2000.  Order No. 16279  issued 06/02/00.



Narragansett Electric Co. - Dkt. 3031 (Transmission Adjustment Factor)   Order approving a revised Transmission Adjustment Factor of $0.00238 per kWh effective June 1, 2000.  Order No. 16275 issued 06/01/00.



Pascoag Fire District - Dkt. 2510   Order approving Demand Side Management budget and programs for year 2000.   Order No. 16268 issued 05/25/00.



Block Island Power Co. - Dkt. D-00-10    Order authorizing debt in the amount of $3,420,000 with the Rural Utilities Service/Federal Financing Bank.  Order No. 16267 issued 05/23/00.



Pascoag Fire District - Dkt. 2861 (Standard Offer)    Order approving revised Standard Offer Charge of $0.03384 per kWh, Transmission Charge of $0.00517 per kWh and Transition Charge of $0.02353 per kWh effective 02/01/00.  Order No. 16246 issued 05/11/00.



Narragansett Electric Co. - Dkt. 1939 (DSM)   Order approving the application of Brown University for a rebate to participate in the Company's Design 2000 Programs.  Order No. 16218 issued 05/04/00.



Narragansett Electric Co. - Dkt. 3024   Order approving amendment to the Terms and Conditions for Nonregulated Power Producers.  Order No. 16209 issued 04/07/00.



DownCity Energy Co. LLC - Dkt. 3091    Petition for declaratory ruling that the provisions of the Consumer Protection Requirements for Nonregulated Power Producers Sections II D(3) and II H (regarding the shutoff of service to customers) does not apply to the relationship between DownCity and its customers.  Order No. 16208 issued 04/07/00.



Narragansett Electric Co., Blackstone Valley Electric Co. & Newport Electric Corp. Consolidation and Adjustment of Rate Relating to Merger - Dkt. 2930 - Order No. 16200 approving  Stipulation and Settlement .  Issued 03/24/00.



Narragansett Electric Co., Blackstone Valley Electric Co. & Newport Electric Corp. Petition to Approve Merger - Dkt. D-99-12   Order No. 16186 approving merger, issued 02/25/00.